Monday, July 4, 2011

The house is all sheetrocked! Over the next few days the crew will tape, mud, texture and prime. Then it will be ready to paint. It's working out great to have the crew there working while David is off at work. Speaking of David working, he will be working 6, 12 hr days each week. The job will probably last a couple months. With a schedule like that it doesn't leave much time for work on our house, but we'll see. Anyway, here are some pictures of the inside of our house. It appears about a 1/3 smaller because now you can't see from one end of the house to the other and all the way up to the roof. It's very exciting to see it get to this point!

Standing at the front door looking right to left.
family room area
 office area
 built in tv cabinet angled here
 kitchen
 door into the mud room, in between kitchen and dining
 dining area
looking right into the mud room
 looking left into mud room
 looking down hallway towards bedrooms
 main bath


 hallway, first closet is coat closet, other two are linen closets
 end of the hallway, bedrooms 1 & 2 on right, master on left

 looking straight into bedroom 2 from hall


 bedroom 1 from hall


 looking towards master from bedrooms 1 & 2
 standing at the door in master, looking left at walk in closet and further down master bath
 walk in closet
 master bath, long vanity on left, toilet at the end of vanity again the wall, shower straight ahead
 master looking left to right



 office area and sliding door
 opposite wall in office area, will be built in bookcase with cupboards below

3 comments:

Anonymous said...

LOOKS GREAT! GLAD I WAS ABLE TO SEE SOME OF THE "BEFORE" PART.

Angela said...

Crazy how close you are getting! You must be so excited!

Jillian said...

Woot woot! Lookin' good. Wish I could have seen it when we were there, but alas. Now I'll just have to see it when it's all completed!